WQT LTD
WATER MAINS CHLORINE RESIDUAL BOOSTING
For large areas using
OXO and Direct Injection
1 DAY |
The Aims:To give staff the skills and knowledge to very accurately boost residuals, (either by OXO water by-pass or direct injection methods). To very accurately dilute chemicals for the purpose of residual boosting. To calculate flows and set up chlorination equipment. To take residual samples using comparators.
Objectives:
- To set up an area for residual boosting using plans and computer software.
- To Dilute chemicals in preparation for chlorination procedure.
- To set up chlorinator either by by-pass system or direct injection mode.
- To measure flows by different methods.
- To measure chlorine residuals.
- To calculate chlorination parameters.
- The use of computer calculation software.
- The use of computer software.
- The use of smart card technology (where applicable)
- COSHH
Duration: 1 day for trained operators
Additional information: Delegates should bring with them protective clothing. Please make enquiries for system requirements, pricing and availability as these can vary from project to project.